Tell us about the project, then choose a preferred date and time. We will call or text to confirm.
What to Expect After Booking Your Free In-Home Estimate
1
We confirm your time
A member of our team calls or texts to confirm the appointment, usually the same or next business day.
2
We visit and measure
Your consultation is at your home. We measure, look at the space and talk through what you want. Bring photos or ideas — we bring the design gallery on an iPad.
3
You get a written estimate
An itemized estimate and proposed schedule follow. There is no charge and no obligation.
Yes. There is no charge for the consultation or the written estimate, and no obligation to go ahead.
How long does the consultation take?
Your consultation is focused on your project, your goals, and how you want the space to function. We’ll take the time needed to measure the space, discuss your ideas, and review the available options.
What should I have ready?
Photos or ideas you like, a rough sense of budget if you have one, and for insurance work, your claim number and adjuster’s contact details.
Is this for emergencies?
No. For active water damage, call us right away — ProRevive Restoration handles emergency extraction and drying.
Can I change or cancel my appointment?
Of course. Reply to our confirmation message or call us and we will find a time that suits you better. There is never a charge for rescheduling.
SERVICE AREA
Where We Work
Covington · Guest Bathroom Remodel
A Fresh, Functional Guest Bathroom in Covington
A guest bathroom remodel in a Covington home: updated finishes, a refreshed vanity, improved lighting, new flooring and a more functional shower area, designed around the existing space.
The Starting Point
The bathroom layout already worked, so there was no need for major structural changes. What held the room back were dated finishes, an aging vanity, worn flooring and lighting that did not provide the function or look the homeowners wanted. The goal was a cleaner, brighter guest bathroom that felt comfortable and fit naturally with the rest of the home.
“We didn’t need a bigger bathroom. We needed one that finally worked for us.”
— Homeowner
What We Planned
The good news: the layout actually worked. The island was in the right spot, the work triangle between the range, sink, and fridge made sense. No walls coming down — that’s always a win for the budget. But a few things caught our eye right away, and we told her about all of them on the spot.
Issue 1
The Tub Was Taking Up Valuable Space
The existing tub was rarely used, so replacing it with a more practical shower created a better use of the available space.
Issue 2
The Vanity Area Needed More Light
The existing vanity didn’t provide enough storage or the lighting they wanted. We planned the new vanity and lighting together so the area would be more functional.
Issue 3
The Bathroom Needed a More Cohesive Look
The existing finishes had been installed at different times and no longer felt connected. The new tile, fixtures, vanity, and hardware were selected to work together as one design.
What We Found During Demolition
Once the existing finishes and fixtures were removed, we inspected the areas behind them before moving forward. Any conditions that required attention were addressed as part of the remodel so the new finishes could be installed over a properly prepared space.
THE PROJECT
Final Checks
Before handover, we checked the plumbing fixtures, shower area, vanity, lighting and new finishes. We also reviewed the completed work with the homeowners and addressed any items that needed attention before the project was complete.
The Finished Room
A refreshed guest bathroom with updated finishes, a clean vanity, improved lighting, refreshed flooring and a more functional shower area. The footprint stayed familiar, while the room became brighter, cleaner and easier to use.
weeks
0
permits
0
junctions
0+
Gig Harbor · Primary Bathroom Remodel
The Bathroom They Finally Made Their Own
A primary bathroom remodel in a Gig Harbor home: updated finishes, a refreshed vanity, improved lighting, new flooring, and a more functional shower area designed around the existing space.
The Starting Point
The existing bathroom had a practical layout but needed an updated look and improved functionality. Dated finishes, an aging vanity, and outdated lighting kept the space from feeling as comfortable and polished as the homeowners wanted. The goal was to create a brighter, more comfortable primary bathroom while working within the existing footprint.
“We didn’t need a bigger bathroom. We needed one that finally worked for us.”
— Homeowner
What We Planned
The good news was that the existing bathroom had a workable layout. We didn’t need to completely change the footprint to make a noticeable difference. The bigger opportunity was improving how the existing space was being used.
Issue 1
The Tub Was Taking Up Too Much of the Room
The existing tub had become more of a visual obstacle than a feature. Rachel and her husband rarely used it, so replacing it with a more practical shower allowed us to open up the room and give the space a cleaner, more functional feel.
Issue 2
The Vanity Needed More Function
The existing vanity didn’t provide the storage or counter space they wanted. We planned a new vanity around how both homeowners actually used the bathroom, with better storage, a more generous countertop, and improved lighting around the mirrors.
Issue 3
The Lighting Made the Room Feel Dark
The bathroom had adequate lighting, but it wasn’t doing the room any favors. We wanted the finished space to feel brighter without making it harsh, so lighting became part of the overall design rather than something added at the very end.
What We Found During Demolition
After the existing fixtures and finishes were removed, we inspected the underlying areas before continuing with the remodel. Any conditions requiring attention were addressed before the new bathroom finishes were installed.
THE PROJECT
Final Checks
Before handover, we checked the plumbing fixtures, shower area, vanity, lighting, flooring, and finished surfaces. We reviewed the completed bathroom with the homeowners and addressed any remaining items before completion.
The Finished Room
A refreshed primary bathroom with updated finishes, a functional vanity, improved lighting, new flooring, and an updated shower area. The existing footprint was preserved while creating a cleaner, brighter, and more comfortable space.
weeks
0
permits
0
days spare
0
Bonney Lake · Guest Bathroom Remodel
A Fresh, Functional Guest Bathroom in Bonney Lake
A guest bathroom remodel in a Bonney Lake home: updated finishes, a refreshed vanity, improved lighting, new flooring, and a more functional shower area designed around the existing space.
The Starting Point
The existing bathroom layout was practical, but dated finishes, an aging vanity, worn flooring, and outdated lighting kept the space from feeling as comfortable and finished as the homeowners wanted. The goal was to create a cleaner, brighter guest bathroom without changing the room’s overall footprint.
“We didn’t need a bigger bathroom. We needed one that finally worked for us.”
— Homeowner
What We Planned
The good news was that the existing layout gave us a solid starting point. There was no need to completely reconfigure the room. Instead, we could focus on the things that would make the biggest difference in how the bathroom looked and functioned.
Issue 1
The Tub Was Taking Up Valuable Space
The original tub/shower combination was no longer serving the way Daniel and his wife used the bathroom. Replacing it with a walk-in shower opened up the room visually and created a more comfortable everyday setup without requiring a larger footprint.
Issue 2
The Vanity Area Needed More Light
The existing lighting left the vanity feeling darker than it needed to be. Better lighting became an important part of the remodel, along with a new vanity and mirror that gave the space a cleaner, more finished appearance.
Issue 3
The Bathroom Needed a More Cohesive Look
The existing finishes came from different eras of the house. Rather than chasing a highly trendy design, we focused on a simple combination of materials, fixtures, lighting, and finishes that would feel current while still fitting naturally with the home.
What We Found During Demolition
Once the existing fixtures and finishes were removed, we inspected the areas behind them before continuing. Any conditions requiring attention were addressed as part of the remodel so the new finishes could be installed over a properly prepared space.
THE PROJECT
Final Checks
Before handover, we checked the plumbing fixtures, shower area, vanity, lighting, flooring, and finished surfaces. We also reviewed the completed work with the homeowners and addressed any remaining items before completion.
The Finished Room
A refreshed guest bathroom with updated finishes, a clean vanity, improved lighting, refreshed flooring, and a more functional shower area. The familiar footprint remains, but the room feels brighter, cleaner, and easier to use.
weeks
0
permits
0
saved
$0K
Auburn · Full Kitchen Remodel
A Brighter, Better-Working Kitchen in Auburn
A full kitchen remodel in a late-1990s Auburn home: new cabinets, quartz countertops, flooring, lighting and a properly vented range hood, built around a layout that already worked.
The Starting Point
The layout was sound. The island, sink, range and refrigerator were all in sensible places, so no walls needed to move. What held the room back was everything else: dark stained cabinets, a tiled island top with worn grout, ageing appliances and a tile floor that had seen better days. The goal was a lighter, easier kitchen that fit the rest of the house.
— Homeowner
What We Planned
The good news: the layout actually worked. The island was in the right spot, the work triangle between the range, sink, and fridge made sense. No walls coming down — that’s always a win for the budget. But a few things caught our eye right away, and we told her about all of them on the spot.
Issue 1
Electrical updates
Outlets and circuits affected by the remodel were brought up to current requirements.
Issue 2
Real ventilation
The recirculating over-range microwave was replaced with a range hood ducted to the outside.
Issue 3
A clean floor transition
The new kitchen floor was planned to meet the living-room flooring with a deliberate, finished edge.
What We Found During Demolition
With the cabinets, countertops and flooring removed, we found moisture damage under part of the old island, left by an earlier sink leak. The damage was limited. We stopped, photographed it, explained the repair and gave the homeowners the price before continuing. The affected material was replaced before any new cabinets went in, with no surprises on the final invoice.
THE PROJECT
Final Checks
Before handover we tested every outlet and circuit that was part of the work, ran the hood to confirm it vents outside, checked every door and drawer for alignment, and walked the floor transitions. Anything that wasn’t right was fixed before the homeowners saw the finished room.
The Finished Room
Light painted cabinets, a quartz island, new flooring carried cleanly into the living room, under-cabinet lighting and a range hood that finally clears the air. Same footprint, a completely different kitchen.