When the drying is done, we put your home back together — floors, walls, cabinets and finishes — with the same team that knows what happened behind the wall.
Water damage rarely ends with the water. By the time a burst pipe, a failed dishwasher line or a roof leak has been dealt with, there are usually flood-cut walls, lifted flooring, removed cabinets and a house that no longer feels like home. Reconstruction is the part that gives it back.
ProRevive Construction rebuilds homes after water damage across Tacoma, Olympia and the South Sound. Because we are the construction side of ProRevive Restoration, we can pick up exactly where drying ends — with the moisture readings, the photos and the insurance documentation already in hand — instead of starting from scratch with a contractor who has never seen the damage.
Our goal is simple: a rebuilt room that matches the rest of your house, or improves on it if you choose, and a process you understand from the first estimate to the final walkthrough.
If the structure is still wet, ProRevive Restoration handles extraction and drying first. We do not close a wall until the readings say it is dry.
These are our own photos from the stage before reconstruction: finding the water, opening the structure and proving it is dry. This is the work that makes a rebuild last.
ProRevive technician in protective gear beside an air scrubber after flood-cut walls
Ceiling opened by ProRevive to trace a leak along plumbing and wiring runs
Thermal camera showing hidden moisture in a wall during a ProRevive inspection
Room with the ceiling removed, drying equipment running and contents protected under plastic
Flood cut along the base of a wall so the cavity behind it can dry
Moisture meter on a floor joist confirming the framing is dry before rebuilding
A detailed flood inspection using thermal imaging, moisture meters, air scrubbers, and controlled demolition to locate hidden moisture, dry affected areas, and prepare the property for safe rebuilding.
ProRevive opened the affected ceiling to trace water along plumbing and wiring runs, identify the source of the damage, and create a clear path for drying and reconstruction.
ProRevive used thermal imaging and moisture detection equipment to identify hidden moisture inside walls and affected areas before beginning the restoration process.
With the ceiling opened and drying equipment running, ProRevive protected the contents and carefully controlled the affected area while the structure was brought back to a dry condition.
ProRevive performed a controlled flood cut along the base of the wall, exposing the affected cavity so trapped moisture could be properly addressed before reconstruction.
A moisture meter was used to verify that the affected floor framing had reached a dry condition, giving the ProRevive team the information needed before moving forward with reconstruction.
The same seven stages we have always followed, from the first inspection to handing your home back.
We inspect the damage, check moisture levels with meters and thermal imaging, and photograph everything for your records and your insurer.
If water is still present, ProRevive Restoration extracts it and dries the structure. Reconstruction starts only when the readings are normal.
A line-by-line rebuild estimate, prepared in the detail adjusters expect, with any upgrades you ask for priced separately.
Matching or choosing finishes, confirming the schedule and ordering materials so there are no gaps once work begins.
Removing anything still damaged, down to sound, dry material — photographed so the scope is documented.
Framing, drywall, flooring, cabinets, trim and paint, built to match the rest of your home.
We walk every room with you, finish the punch list and leave you with a complete record of the work.
Most water damage reconstruction is paid for, at least in part, through a homeowner’s insurance claim. We work with all insurance providers, and we know what an adjuster needs to see: a clear record of the damage, a rebuild scope broken down line by line, and photos of hidden conditions as they are uncovered.
You stay in control of the claim. We will explain our estimate, answer your adjuster’s questions and keep you copied on everything we send. If your insurer’s approved scope differs from ours, we will walk you through the difference and what it means for your home, rather than quietly building less.
If you would like to use the rebuild as a chance to upgrade — better cabinets, a walk-in shower where the old tub was — we price that separately, so it is always clear which costs are covered and which are yours.
A damaged interior can require more than cleanup. ProRevive Construction helps rebuild affected areas and restore your home after water damage.
From damaged interiors to full reconstruction, ProRevive Construction provides the building expertise needed to bring your home back to a functional, finished space.
It depends on how much was removed and on material lead times — a section of drywall and paint is very different from a full kitchen rebuild. Your written estimate includes a schedule, and we update it if anything changes.
In most cases you can choose your own contractor. Check your policy and ask your adjuster; we are happy to work alongside them either way.
Matching is part of the job. We identify existing materials where we can, source the closest match, and talk to you before work starts if an exact match is no longer made — sometimes the best answer is to carry a new floor through into the next room.
We photograph it, explain it and price it before doing anything further. For insurance jobs, we send the photos and a supplement to your adjuster.
Yes. We will ask for the drying records and take our own moisture readings before we close anything up.
Mold remediation is done by ProRevive Restoration before reconstruction begins. We rebuild once the area has been cleared.
We work across Pierce, Thurston and South King County — from Olympia and Tumwater up to Kent and South Seattle.
Not sure if you are in our area? Call us. If we can’t take the job, we will tell you straight away.
Tell us what you have in mind and when suits you. We come out, measure, talk through the options and follow up with an itemized written estimate — no charge and no pressure.
A guest bathroom remodel in a Covington home: updated finishes, a refreshed vanity, improved lighting, new flooring and a more functional shower area, designed around the existing space.
The bathroom layout already worked, so there was no need for major structural changes. What held the room back were dated finishes, an aging vanity, worn flooring and lighting that did not provide the function or look the homeowners wanted. The goal was a cleaner, brighter guest bathroom that felt comfortable and fit naturally with the rest of the home.
“We didn’t need a bigger bathroom. We needed one that finally worked for us.”
— Homeowner
The good news: the layout actually worked. The island was in the right spot, the work triangle between the range, sink, and fridge made sense. No walls coming down — that’s always a win for the budget. But a few things caught our eye right away, and we told her about all of them on the spot.
The existing tub was rarely used, so replacing it with a more practical shower created a better use of the available space.
The existing vanity didn’t provide enough storage or the lighting they wanted. We planned the new vanity and lighting together so the area would be more functional.
The existing finishes had been installed at different times and no longer felt connected. The new tile, fixtures, vanity, and hardware were selected to work together as one design.
Once the existing finishes and fixtures were removed, we inspected the areas behind them before moving forward. Any conditions that required attention were addressed as part of the remodel so the new finishes could be installed over a properly prepared space.


A refreshed guest bathroom with updated finishes, a clean vanity, improved lighting, refreshed flooring and a more functional shower area. The footprint stayed familiar, while the room became brighter, cleaner and easier to use.
A primary bathroom remodel in a Gig Harbor home: updated finishes, a refreshed vanity, improved lighting, new flooring, and a more functional shower area designed around the existing space.
The existing bathroom had a practical layout but needed an updated look and improved functionality. Dated finishes, an aging vanity, and outdated lighting kept the space from feeling as comfortable and polished as the homeowners wanted. The goal was to create a brighter, more comfortable primary bathroom while working within the existing footprint.
“We didn’t need a bigger bathroom. We needed one that finally worked for us.”
— Homeowner
The good news was that the existing bathroom had a workable layout. We didn’t need to completely change the footprint to make a noticeable difference. The bigger opportunity was improving how the existing space was being used.
The existing tub had become more of a visual obstacle than a feature. Rachel and her husband rarely used it, so replacing it with a more practical shower allowed us to open up the room and give the space a cleaner, more functional feel.
The existing vanity didn’t provide the storage or counter space they wanted. We planned a new vanity around how both homeowners actually used the bathroom, with better storage, a more generous countertop, and improved lighting around the mirrors.
The bathroom had adequate lighting, but it wasn’t doing the room any favors. We wanted the finished space to feel brighter without making it harsh, so lighting became part of the overall design rather than something added at the very end.
After the existing fixtures and finishes were removed, we inspected the underlying areas before continuing with the remodel. Any conditions requiring attention were addressed before the new bathroom finishes were installed.


A refreshed primary bathroom with updated finishes, a functional vanity, improved lighting, new flooring, and an updated shower area. The existing footprint was preserved while creating a cleaner, brighter, and more comfortable space.
A guest bathroom remodel in a Bonney Lake home: updated finishes, a refreshed vanity, improved lighting, new flooring, and a more functional shower area designed around the existing space.
The existing bathroom layout was practical, but dated finishes, an aging vanity, worn flooring, and outdated lighting kept the space from feeling as comfortable and finished as the homeowners wanted. The goal was to create a cleaner, brighter guest bathroom without changing the room’s overall footprint.
“We didn’t need a bigger bathroom. We needed one that finally worked for us.”
— Homeowner
The good news was that the existing layout gave us a solid starting point. There was no need to completely reconfigure the room. Instead, we could focus on the things that would make the biggest difference in how the bathroom looked and functioned.
The original tub/shower combination was no longer serving the way Daniel and his wife used the bathroom. Replacing it with a walk-in shower opened up the room visually and created a more comfortable everyday setup without requiring a larger footprint.
The existing lighting left the vanity feeling darker than it needed to be. Better lighting became an important part of the remodel, along with a new vanity and mirror that gave the space a cleaner, more finished appearance.
The existing finishes came from different eras of the house. Rather than chasing a highly trendy design, we focused on a simple combination of materials, fixtures, lighting, and finishes that would feel current while still fitting naturally with the home.
Once the existing fixtures and finishes were removed, we inspected the areas behind them before continuing. Any conditions requiring attention were addressed as part of the remodel so the new finishes could be installed over a properly prepared space.


A refreshed guest bathroom with updated finishes, a clean vanity, improved lighting, refreshed flooring, and a more functional shower area. The familiar footprint remains, but the room feels brighter, cleaner, and easier to use.
A full kitchen remodel in a late-1990s Auburn home: new cabinets, quartz countertops,
flooring, lighting and a properly vented range hood, built around a layout that already worked.
The layout was sound. The island, sink, range and refrigerator were all in sensible places, so no walls needed to move. What held the room back was everything else: dark stained cabinets, a tiled island top with worn grout, ageing appliances and a tile floor that had seen better days. The goal was a lighter, easier kitchen that fit the rest of the house.
— Homeowner
The good news: the layout actually worked. The island was in the right spot, the work triangle between the range, sink, and fridge made sense. No walls coming down — that’s always a win for the budget. But a few things caught our eye right away, and we told her about all of them on the spot.
Outlets and circuits affected by the remodel were brought up to current requirements.
The recirculating over-range microwave was replaced with a range hood ducted to the outside.
The new kitchen floor was planned to meet the living-room flooring with a deliberate, finished edge.
With the cabinets, countertops and flooring removed, we found moisture damage under part of the old island, left by an earlier sink leak. The damage was limited. We stopped, photographed it, explained the repair and gave the homeowners the price before continuing. The affected material was replaced before any new cabinets went in, with no surprises on the final invoice.


Before handover we tested every outlet and circuit that was part of the work, ran the hood to confirm it vents outside, checked every door and drawer for alignment, and walked the floor transitions. Anything that wasn’t right was fixed before the homeowners saw the finished room.
Light painted cabinets, a quartz island, new flooring carried cleanly into the living room, under-cabinet lighting and a range hood that finally clears the air. Same footprint, a completely different kitchen.